Index.php

From Institutional Effectiveness and Accreditation

Revision as of 12:57, 29 October 2013; view current revision
←Older revision | Newer revision→
Jump to: navigation, search

Fort Sam Houston in San Antonio, Texas could be the world's biggest military medical training center. As you of the U.S. Army's earliest installations - where the first medic recruit arrived back in 1845 - Fort Sam Houston will be the country's National Historic Landmark with greatest single-site assortment of historic buildings, more than 900 buildings. These properties report various eras and replicate evolving developments in Army planning and design.But Fort Sam Houston isn't only about preserving history and documenting 'the way in which things were.' Today, significantly more than 27,000 military and civilian employees work on the post and continuous new building jobs (averaging $30 million annually) co-exist right along with the post's traditional parts.<br /><br />One recent project required the construction of four new METC (Medical Education Training Campus) dormitories to house 2,400 military medical personnel for short-term training and education.Plan of AttackThe project confronted four primary constraints that designers and contractors had to overcome. First, the barracks were limited by how big is the existing structure. Minute, each unit had to meet up with the Army Corps of Engineers' dependence on the square-footage allotted to each knight. Third, the construction technique needed to supply an STC rating of almost 50 in a place with regular tank and artillery fire, planes, chopper noise and things that go 'boom' inside the evening. Finally, the compact has to fulfill the rigid demands of Leader in Energy and Environmental design (LEED) Silver Certification.The contractor, combined with the U.<br /><br />S. Army Corps of Engineers, made a decision to construct the new METC dormitories off-site in 682 modular sections. Due to the external building restrictions, the initial choice to hit the cutting room floor was the standard way of using tough programs for party walls. Tough channel could have wasted precious space on the floor and wasn't a feasible option.Instead, U.S [hhttp://www.youtube.com/user/DallasRoofingPros roofing contractor dallas]. Army Corps of Engineers enlisted the aid of the QuietSolutions product-line from Serious Materials, including soundproofing drywall.<br /><br /> This permitted the task to store space on every indoor wall by building just as though they certainly were using regular drywall.Soundproofing drywall was deployed by the builder and performed under-fire just like regular gypsum board - just better - and achieved the specified STC score without compromising one square-inch of troop dwelling space.How the War Was WonWhen the (building) dirt had cleared, Serious Materials' soundproofing drywall achieved an STC-rating of near to 50 while also providing the exact amount of livable of square footage per soldier within the restricted exterior building constraints.Using soundproofing drywall in the place of resilient channel also decreased labor costs by reducing installation time. Because sound-proofing drywall installs just like frequent drywall, no new product instruction was essential and it saved time compared to the installation for sturdy funnel - moreover it helped make points for LEED Certification.Mission accomplished.

Personal tools